Notification: FAQs
When does the installation of a pump or booster have to be notified?
The requirement to notify the proposed installation of 'a pump or booster drawing more than 12 litres per minute, connected directly or indirectly to a supply pipe' applies to all pumps capable of delivering any flow rate greater than 12 litres per minute.
For example, a shower which is supplied with water through a pump (located either upstream or downstream of the mixing valve) capable of delivering more than 12 litres/minute.