RPZ FAQs: Testing
What is a compliance test?
This is an on-site procedure to demonstrate a RPZ valve has been installed correctly, and all key components are functioning as required under the RPZ AIM
In the case of existing RPZ valves the local water undertaker will advise when compliance testing is required. Those tested annually should not be tested earlier than 30 days prior to the test due date without the agreement of the water undertaker.
Full details are provided in section 5 of the RPZ AIM.
Feedback
To improve this information please give us your feedback >
Disclaimer
Uncontrolled if downloaded. This is informative, non-statutory guidance and intended for general guidance purposes only; it is subject to change.
Compliance with this information should not be relied upon as guaranteeing no enforcement action will be taken by water undertakers. Water Regs UK accepts no liability for loss, indirect or consequential loss arising from or in connection with this guidance document.